Services | Clyde Park Roofing & Maintenance | Clyde Park, MT
From quick fixes to major projects, Clyde Park Roofing & Maintenance has been the roofing contractor Clyde Park homeowners call for 24 years. Here's a rundown of what we offer.
Roof Replacement
The average roof replacement in Clyde Park takes one day for a standard residential home. Larger or steeper roofs might take two. Either way, we don't leave a house uncovered overnight. If we tear it off, we cover it before we leave. No exceptions.
Get a Free Quote โRoof Repair
Improper step flashing is the leading cause of roof leaks at wall-to-roof transitions. Step flashing needs to be woven between shingle courses with each piece extending 4" above the shingle exposure. We see Clyde Park homes where the last roofer used continuous L-flashing or just caulked the gap. That always fails. We tear it out and install proper step flashing with a kick-out diverter at the bottom per IRC R905.2.8.3.
Get a Free Quote โStorm Damage Repair
Storm damage is time-sensitive. Most insurance policies in Montana require claims within 12 months. We do a free inspection, document every damaged area with photos and measurements, and help you file the claim. If the adjuster approves it, we handle the repairs at the insurance-approved price.
Get a Free Quote โNew Roof Installation
New construction underlayment per IRC R905 and ASTM D226 (felt) or ASTM D6757 (synthetic). Ice barrier per ASTM D1970 required at eaves in climate zones with average January temperature below 25ยฐF. We install ice and water shield regardless. It's cheap insurance against ice dams and wind-driven rain. Drip edge per IRC R905.2.8.5 on eave and rake edges. Proper starter strip with factory sealant for wind resistance from day one.
Get a Free Quote โMetal Roofing
Metal roof repairs are usually sealant failures at transitions, loose panels from improper installation, or rust spots on older galvanized systems. Our Clyde Park crew repairs all metal types. Not every issue needs a full replacement. Sometimes a sealant touch-up or panel re-securing solves it.
Get a Free Quote โShingle Roofing
Shingle color matters more than you think. Dark shingles absorb heat. Great for cold Montana winters, harder on cooling bills in summer. Lighter colors reflect heat. Algae-resistant granules prevent black streaking. We bring shingle samples to your Clyde Park home so you can see them against your siding and trim.
Get a Free Quote โFlat Roofing
The number one cause of flat roof failure is ponding water. Standing water that doesn't drain within 48 hours after rain. We solve ponding by installing tapered insulation systems that create positive slope to drains, scuppers, or roof edges. Minimum 1/4" per foot of slope eliminates standing water.
Get a Free Quote โCommercial Roofing
Multi-family properties in Clyde Park need roofing contractors who understand occupied buildings. We schedule around tenants, contain debris, and minimize noise during reasonable hours. Emergency leak repairs get priority. Water in someone's apartment is an emergency.
Get a Free Quote โGutter Installation
Clogged gutters cause fascia rot, soffit damage, and foundation erosion from concentrated water runoff. That's not a marketing scare tactic. We see the damage on every other gutter replacement in Clyde Park. Properly sized gutters with adequate downspout capacity move water away from the house. We calculate capacity using rainfall intensity data for Clyde Park: roof area x pitch factor x rainfall rate in inches per hour. Standard 5" K-style handles 5,520 square feet of effective roof area.
Get a Free Quote โRoof Inspection
Commercial and flat roof inspections include infrared moisture scanning with Flir E8 thermal cameras. Trapped moisture in the insulation layer shows as temperature differentials on the thermal image. No need to cut core samples everywhere. We identify wet zones, then core sample the suspect areas to confirm. This approach gives you a precise repair scope at a fraction of the cost of exploratory tear-offs.
Get a Free Quote โEmergency Roof Repair
Emergency protocol for active water intrusion: (1) interior containment. Buckets, plastic sheeting, water extraction if accessible, (2) exterior tarping with 20x30 heavy-duty poly sheeting over damaged area extending minimum 4 feet past damage on all sides, (3) secure with 2x4 nailer boards lag-screwed to the roof deck (not through shingles), (4) secondary tarp overlap for multi-section damage, (5) document with timestamped photos for insurance. Permanent repair scheduled within 48-72 hours once materials are sourced.
Get a Free Quote โSkylight Installation
Skylights done right bring natural light into spaces that need it most. Bathrooms, hallways, closets, kitchens with limited windows. We install VELUX and Fakro units with manufacturer flashing kits that integrate with your existing shingle field. Proper flashing is everything. Bad skylight installs are a leading cause of roof leaks.
Get a Free Quote โ